The first public announcement of environmental impact assessment of megawatt wind turbine blade technology upgrading project of Hinggan League Aeolon Wind Power Technology Development Co., Ltd

Column:Corporate News Time:2022-09-20

1. Name and Summary of Construction Project:

Project name: megawatt wind turbine blade technology upgrading and transformation project of Hinggan League Ailang Wind Power Technology Development Co., Ltd

Construction site: south of Guihua Road, west of Tianjiao Road, Horqin Right Front Banner Industrial Park, Hinggan League

Construction unit: Hinggan League Ailang Wind Power Technology Development Co., Ltd

Geographic coordinates of the project center: E121 ° 58'55.33 "; N 46 ° 03'26.15"

Construction nature: Technical renovation

Construction scale: Two new 93 meter 6.7 megawatt production lines will be added to meet the needs of the domestic wind power blade market, especially the development trend of the wind power market in the eastern Mongolia region. After the project is completed, 160 sets of megawatt level wind turbine blades (93 meter blades) can be produced annually.

Construction content: Add two 93-meter production lines and supporting facilities, renovate three cranes, and renovate the paint room processing workshop.

2. Name and contact information of the construction unit

Construction unit: Hinggan League Ailang Wind Power Technology Development Co., Ltd

Contact person: Wang Gang

Contact information: 13354825099

Email: [email protected]

Mailing address: Hinggan League Ailang Wind Power Technology Development Co., Ltd., south of Guihua Road, west of Tianjiao Road, Horqin Right Front Banner Industrial Park, Hinggan League.

3. Basic information of the preparation unit of the environmental impact report

EIA unit: Drogön Chögyal Phagpa Environmental Technology Consulting Co., Ltd

4. Online link to public opinion form

http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

5. Ways and means of submitting public opinion forms

Within 10 working days from the date of public announcement, the public may submit the completed public opinion form, etc. to the construction unit within the specified time by letter, email, or other means provided by the construction unit, reflecting opinions and suggestions related to the environmental impact of the construction project.

Hinggan League Aeolon Wind Power Technology Development Co., Ltd

September 13, 2022